Do you have a question about the Ideal Boilers Classic FF 340 and is the answer not in the manual?
Safety and operational guidelines including casing, ventilation, faults, and flammable materials.
100 mm (4") clearance required above the boiler.
5 mm (1/4") clearance required at each side of the boiler.
100 mm (4") clearance required underneath the boiler.
75 mm (3") clearance required in front of the boiler for servicing.
Turn boiler ON/OFF switch to OFF for short periods.
| Brand | Ideal Boilers |
|---|---|
| Model | Classic FF 340 |
| Category | Boiler |
| Language | English |












Loading...