Do you have a question about the Ideal Heating IMAX XTRA 2 and is the answer not in the manual?
Always turn off gas and electricity supply before servicing or replacing components.
Details of components included in the conversion kit and their descriptions.
Essential safety measures to be followed during installation and maintenance procedures.
Key checks to perform after completing servicing or replacement of components.
Instructions for removing the top panel of the boiler unit.
Procedure for detaching and removing the control pod.
Steps to remove the front panel, exposing internal components.
Guide for removing the side panels of the boiler.
Detailed steps for removing and replacing the orifice plate and O-ring.
Information regarding the flue adaptor on 200kW models during conversion.
Instructions for accessing service mode and updating boiler parameters for Natural Gas.
Screenshots and steps for configuring the boiler for Natural Gas conversion.
Steps to adjust the gas valve for maximum rate output and CO2 measurement.
Steps to adjust the gas valve for minimum rate output and CO2 measurement.
Guide to setting the boiler to maximum rate operation via the service mode.
Guide to setting the boiler to minimum rate operation via the service mode.
Steps for removing old labels and applying new Natural Gas data labels.
Information on the disposal of packaging and product according to WEEE directive.
Information on technical training options and company contact details.
| Brand | Ideal Heating |
|---|---|
| Model | IMAX XTRA 2 |
| Category | Industrial Equipment |
| Language | English |
Loading...