5.- OPERATION
The configuration and operation functions are organized in a structured programming menu.
Once the system is powered on, the system always will start in the state previous to
disconnection.
5.1. ELECTROLYSIS SYSTEM
5.1.1. INITIALIZATION
When initiating the IDEGIS system at first time, it will be necessary to program some system
parameters following the flow-sheet shown below
IMPORTANT
: ORP control must be always selected (“YES”) if you want to run the IDEGIS
system in AUTOMATIC mode.
19