EasyManua.ls Logo

IEC 30 Series - Page 37

Default Icon
69 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
SECTION
4
Table
4-2.
Calibration
and
Performance
Checks
(Continued)
~
.--.
Step
Calibration
Control
Setting
Test
Equipment
(Mode)
Procedure
15.5
DIAL
CALIB:
Low
(Cont'd)
4.
If
F3
is
more
than
5%
lower
than
F2 :
Loosen
hex
nut
on
pot
R210
and
rotate
pot
CCW.
Remeasure
F3'
5.
Repeat
steps
15.
2,
15.3
and
15.4
until
F 3 =F 2
±5%
15.6
SWEEP
TIME
CAL.
MODE @
Cont
Swp
WAVEFORM
@ Swp
SWP
TIME
@
Ims
SWP
VERNIER
@
Cal.
Counter-
Time
Interval
1.
Connect
time
inter-
val
counter
to
TP29
via
10
Megohms
<:
15 pf
probe.
2.
Measure
time
interval
between
positive
going
and
negative
going
transitions
of
TP29.
Adj.
R288
for
1000
±5
us.
3.
Set
SWP
Time
@ 10
us.
Time
interval
(ramp
up) of 10
±O.
2
us.
4.
Check
time
intervals
of 100
us,
10
ms,
100
ms
and
1 s
SWPTIME
ranges
for
proper
reading
±3%.
15.7
100:1
Adj.
SWP TIME @
lms
SWP
VERN
@ CCW
stop
1.
Adj.
R301
for
time
interval
of 115
±10
ms.
SWP
TIME
@
1s
SWP
VERN
@ CCW
stop
2.
Time
interval
shall
be
between
105s
and
130s.
15.8
SWP
Base
Line
SWP
TIME
@ 10
us
SWP
VERN
@
Cal
SCOPE
1.
Connect
Scope
to
TP27
via
x10
probe.
SWP
retrace
not
to
over-
shoot
DC
Zero
by
more
than
20
mv
.
4-11