Fan Coils
INSTALLATION, OPERATION, & MAINTENANCE MANUAL
3
SECTION ONE — Receipt & Initial Installation
4 Preface
4 Unpacking and Inspection
5 Handling and Installation
5 Installation Instruction for Ceiling
Hung Units
6 Cooling/Heating Medium
Connections
7 Horizontal Unit Drain Pan Removal
7 Valve Package Installation
and Maintenance
8 Ductwork Connections
8 Electrical Connections
9 Exposed Unit Touch Up and
Repainting
SECTION TWO — Start Up
9 General
10 Cooling/Heating System
10 Air System Balancing
10
Eco-telligent
®
Motor
11
Water Treatment
12
Water System Balancing
12
Controls Operation
SECTION THREE — Normal Operation &
Periodic Maintenance
12 General
13 Motor/Blower Assembly
13 Coil
13 Electric Resistance Heater Assembly
TableofContents
13 Electrical Wiring and Controls
14 Valves and Piping
14 Filters, Throwaway
14 Filters, Permanent
14 Drain
14-15 Replacement Parts
SECTION FOUR — Equipment Start-up
16 Check List - IMPORTANT
17 Appendix A Adjustment of
ICM AW4105
18 Appendix B Adjustment of
EVO/ECM-4SPD
19 Terms and Conditions

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the IEC HPY 08 and is the answer not in the manual?

IEC HPY 08 Specifications

General IconGeneral
BrandIEC
ModelHPY 08
CategoryAir Conditioner
LanguageEnglish

Related product manuals