EasyManua.ls Logo

Intellian v240C - Page 36

Intellian v240C
177 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
v240C – Marine Satellite Communication System
36
11. Detachment of the Upper Antenna
In order to attach lifting
straps, the following
steps must be performed.
This is the initial position
of the EL Arm xture bolt.
The initial position should
be moved to the middle
tap as indicated on left.
A.
B.
C.