117A
SAVE THESE INSTRUCTIONS
English
(117IO) CLEARVIEW PRISM FRAME™ PREMIUM POOL ENGLISH 7.5” X 10.3” PANTONE 295U 12/14/2020
Page 13
14
.
Fold the liner horizontally in half (see drawing 10.1). Insert one rolling pipe (11) between the folded
sections, then place the second rolling pipe on top of the folded liner (see drawings 10.2 &
10.3).
Make sure the two rolling pipes cover the clear view panel and do not exceed the liner top edge.
15
.
Begin rolling the liner from the end with the 2 rolling pipes to the other side gently (see drawing 11.1).
Do not compact the liner. Make sure the clear view panel is facing up during storage.
16.
Fold the rolled up liner in half twice (see drawings 11.2, 11.3 & 11.4)
.
17
. Store the liner and accessories in a dry, temperature controlled, between 32 degrees Fahrenheit
(0 degrees Celsius) and 104 degrees Fahrenheit (40 degrees Celsius), storage location.
18
.
The
original packing can be used for storage (see drawings 12 & 13).
POOL MAINTENANCE & DRAINAGE
(
continued
)
10.1
11.1 11.2
11.4
12 13
11.3
10.2 10.3