4
(1) Introduction
1.1 Unpacking and checking
When
ou unpack
our new meter, these are the parts
ou should have:
1. Di
ital multimeter fitted with alkaline batteries
2. Set of test leads (one black and one red)
3. Operatin
manual
4. Rubber holster
Markings on the unit
#
Attention – Follow the operatin
instructions
"
Dan
er – Dan
erous volta
es ma
occur at these connections
1
S
mbol for double insulation