EasyManuals Logo

Isuzu 4JB1T User Manual

Isuzu 4JB1T
60 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #48 background imageLoading...
Page #48 background image
00 – 50 SERVICE INF
ORMATION
QU
ICK-ON START III SYSTEM
(4JG2 only)
Quick-On Start System Inspection Procedure
1.
Disconnect the thermo-sensor connection on the
thermostat outlet pipe.
2. Turn the starter switch to the “ON” position.
If the Quick-On Start III System is operating properly,
the glow relay will make a clicking sound within seven
seconds after the starter switch is turned on.
3.
Measure the glow plug terminal voltage with a circuit
tester immediately after turning the starter switch to
the “ON” position.
Glow Plug Terminal Voltage V
8 – 9
NO
TE:
Electrical pow
er to the quick-on start system will be
cut after the starter has remained in the “ON”
position for twenty seconds.
Turn the starter switch to the “OFF” position and
back to the “ON” position.
This will reset the Quick-On Start III System.
0049-
1.tif
0049-2.tif

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Isuzu 4JB1T and is the answer not in the manual?

Isuzu 4JB1T Specifications

General IconGeneral
Displacement2.8 L (2771 cc)
Bore x Stroke93 mm x 102 mm
Fuel SystemDirect Injection
Cooling SystemWater-cooled
AspirationTurbocharged
WeightApprox. 230 kg (dry)

Related product manuals