Installing the Instrument              
  Copyright © ITECH Electronics Co., Ltd.  1 
Chapter1 Installing the Instrument 
1.1 Verifying the Shipment 
Unpack the box and check the contents before operating the instrument. If wrong 
items have been delivered, if items are missing, or if there is a defect with the 
appearance of the items, contact the dealer from which you purchased the 
instrument immediately. The package contents include: 
Checklist of Package Contents 
 
Item  Qty.  Model  Remarks 
IT6100 power 
supply 
x1  IT6100 series 
The IT6100 series include: 
IT6121/IT6122/IT6123/ 
IT6151/IT6152/IT6153/IT6154 
Power cord 
x1 
IT-E171/IT-E172
/IT-E173/IT-E17
4 
User may select an appropriate 
power cord that matches the 
specifications of power socket 
used in the area. See the 
Section Connecting the Power 
 
USB cable 
-  - 
CD  x1  - 
It contains IT6100 power supply 
User’s Manual, Programming 
Guide and other user 
x1  - 
It is the test report of the 
instrument before delivery. 
 
Note 
Upon verification of the shipment, keep the package and relevant contents thereof in a safe 
place. When returning the instrument for warranty service or repair, the specified packing 
requirements shall be met. Refer to IT6100 User’s Manual for detailed requirements on 
returns. 
IT6100 series power supply has the following optional accessory: 
  IT-E151:19 inch rack mount 
  IT-E121:RS232 communication cable 
  IT-E122:USB communication cable 
  IT-E135:GPIB connector 
  IT-E123:RS485 communication cable 
1.2 Instrument Size Introduction 
  The instrument should be installed at well-ventilated and rational-sized space. 
Please select appropriate space for installation based on the power supply size.