EasyManua.ls Logo

Izzo Vivi PID Plus - 4. Installation; 5. General Operation; 5.1 Display; 5.2 Parameter Setting

Izzo Vivi PID Plus
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
8
RESERVES THE RIGHT TO MAKE
ALL NECESSARY CHANGES TO THE PRODUCTS, DICTATED BY LEGISLATIVE,
INDUSTRIAL, COMMERCIAL OR AESTHETIC PURPOSES.
4. INSTALLATION
Install the machine on a well-levelled, dry, smooth, and sturdy
supporting surface in a well-ventilated area.
Before using the coffee machine, make sure that:
the dispensing lever is facing downward (fig. 6, tab. 1);
the water and steam knobs are closed (fig. 4 and 5, tab. 1);
the switch is in the "0 " or "OFF" position (fig. 10, tab. 1);
the lower drip tray is correctly positioned (fig. 7, tab. 1).
5. GENERAL OPERATION
5.1 DISPLAY
The machine is equipped with a display that provides the instructions
required for operation (Fig. 1, Tab. 1).
The display consists of an LED and two keys used for interacting with
it. The picture below shows the DISPLAY of the machine.
5.2 PARAMETER SETTING
The LED on the display flashes when the heating element is operating.

Table of Contents

Related product manuals