CONFIDENTIAL PROJECT NAME | date 项目名称 | 日期 22
Operation Instruction –technical parameter
P 6 2 0/1/2/3 0
2: motor initial angle measurement
Calculate the transmission ratio mode
modle 1 (It has needle stop position of automatic test, running 5s , stopping
P 6 6 0/2 2
:open safety switch function;0: close;
P 6 8 0~5000 4000
The maximum speed limit of the machine head
(inside spped limite)
P 7 1 0~50 2
Slow release lifter level adjustment, the smaller values and the faster quickly
P 7 6 1~500 60
Back sewing electromagnet full output time
ms
P 7 8 10~359
tart angle
P 7 9 0~359
320
8
0~4 4
ice volume (0~4),4 maxicum(after factory seeting will not change)
9
0/1/2 1
selection 0:voice close ,1:Chinese,2:English,default: Chinese
0
1~9999 5000
The lift foot release down Delay time after remove cloth when sensing turn on.
1
0~600 50
The lift foot release down Delay time with cloth when sensing turn on.
Unit :0.1s