2/7
1
2
3
4 5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
Fig.1-2 Controller Interface Definition
1.3 Wiring and Grounding
We must prepare the system grounding project, please a qualified electrical engineer to be construction. Product is energized and
ready for use; you must ensure that the power outlet the AC input is securely grounded. The grounding wire is yellow and green lines,
it must be connected to the grid and reliable security protection on the ground to ensure safe use, and prevent abnormal situation.
:All power lines, signal lines, ground lines, wiring not to be pressed into other objects or excessive distortion, to ensure safe
use!
2 Operation Panel Instructions
2.1 Operation Panel Display Instruction
According to the system working state,the LCD module of opetation panel will display the current sewing patterns, various
parameters, start / end back tacking, and presser foot, needle stop position, trimming, Slow up start sewing ect icon.The opetation
panel of the function icon shows as follows.
Fig.2-1 Operation Panel Fig.2-2 Operation Panel
Fig.2-1 Operation Panel
Index
Icon Description Index Icon Description
①
Free sewing
○
11
Number display
②
Multi-section constant-stitch sewing
○
12
Start back tacking
③
W bar tacking sewing
○
13
End back tacking
④
Position down
○
14
Voice broadcast
⑤
Position up
○
15
Communication system
⑥
Automatic trimming
○
16
Soft start
⑦
Foot lifting at seam End
○
17
Count needle number
⑧
Foot lifting after trimming
○
18
Count number of times
⑨
Presser foot lifting
○
19
A B C D
Sewing segments
⑩
Thread clamp
○
20
Induction automatic presser foot lifting
Интернет магазин промышленного швейного оборудования http://procapitalist.ru/sms