Page 9
Jandy
®
JXi
™
Gas-Fired Pool and Spa Heater | Installation & Operation Manual
2.2 Required Equipment
Please ensure that the following equipment is available to the installer at the time of installation.
2.2.1 Tools
Safety Eyewear Gloves Phillips Screwdriver
Flathead
Screwdriver
Pipe Wrench
Adjustable Wrench 3/16 in Hex Key Channel Locks
Digital Differential
Manometer
Voltage Meter
PVC Pipe Cutter Power Drill Tape Measure
Gas Supplies
Electrical
Supplies
Plumbing
Supplies
Appropriately sized Gas
Piping (see Section 4.1)
120 or 240 VAC PVC Piping
Manual Gas Shut Off Valve
Conduit Elbow/
Conduit connector.
PVC Cement
Gas Union Flexible Conduit
PTFE (Tefl on
™)
Tape
Gas Pipe Cap Wire Nuts (3 ea.)
Leak Solution
1/16 in Hose “T”
1/8 in - 1/16 in Barbed
Adapter
1/16 in Flexible Hose
2.2.2 Materials Supplied by Installer
Please ensure that all materials used during the
installation are in accordance with local codes or the
authority having jurisdiction (AHJ) requirements. If
you have any questions regarding the materials that
need to be used during this installation please call
the Zodiac customer service center at 1-800-822-
7933.
Indoor installations will require additional venting and
exhaust conversion materials which are outlined in
detail in Section 3.3.
NOTE: Required materials may differ from the materials
listed. Be sure to confi rm with all local and
national codes before beginning the installation.