INSTALLATION INSTRUCTIONS
Once all the steps in the installation
process have been successfully
followed and any external
accessories have been correctly
connected — the door, operator and
any external accessories should be
fully tested prior to handover and
demonstration to the customer or
authorized representative.
The handover process should
include the exchange of any owners
manuals, instruction manuals,
warranty cards or documents,
remote control transmitters together
with a complete demonstration of the
fully functioning door, operator and
any external accessories.
Contact Information:
Janus International
134 Janus International Blvd.
Temple, GA 30179
770.562.2850
770.562.1991 fax
www.janusintl.com
STEP 12.
“Commissioning and
handover of the door and
operator”
Check List
Check activation of manual
release lever
Check auto reverse function
Check auto close — if
selected
Check timer device — if
connected
Check photo electric sensor
function—if connected
Check edge sensor function —
if connected
Check wall switch — if
connected
Check remote control
transmitter operation — if
connected
Check all manual locks are
inoperable
Check spring tension of door in
manual operation
Demonstrate all functions to
client and hand over any
accessory items or
documentation
Remove “test plug” at photo
electric sensor terminal if fitted