EasyManua.ls Logo

jcb 8008 CTS - Start Up Sequence

jcb 8008 CTS
24 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
12 Please see operator manual for full details.
21 3
4
Engine Pre Heat
Engage Seat Belt
Start Machine
Operate Machine
Move the throttle lever to half
speed position. Turn the starter
key to position 2 for 6 seconds
to warm the engine.
All controls are now active
and the machine is now ready
to use.
From ignition position 2 turn
ignition to position 3 to start
the machine.
Engage seat belt (A) into latch
(B) before starting machine.
Start Up Sequence

Related product manuals