EasyManua.ls Logo

JDS Uniphase Certifier40G - Set Certifier40 G Reference Calibration

JDS Uniphase Certifier40G
58 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Using the Certifier40G
32
2.1.7 How do I set reference between local and
remote units?
It is recommended that whenever the local and remote unit
pair is being used for the first time you perform a set
reference measurement. If there is a mismatch between the
software versions or the reference calibration between local
and remote units has expired, the Certifier40G would require
you to perform a set reference measurement.
To perform a set reference measurement, go to the TOOLS
menu and select the set reference measurement icon.
Connect the Certifier40G local and remote unit for reference
calibration. This is done by connecting a Permanent Link
Adapter at the local end and a Channel Adapter at the
remote end and connecting them together. Press “” to start
the Set Reference procedure, once the Set Reference is
complete the screen shows a Pass or Fail message. The
flow of the screens is shown below.
Figure 17: Screens showing Set Reference Procedure

Table of Contents