Page 7 of 28
Technical Support tac@jdsu.com 1 866 228-3762
Systems Engineer Dave.Baker@jdsu.com 321-243-0600
For Layer 3 IPv4 testing, configure the following additional settings:
Options displayed after tapping
Source IP Address field.
Options displayed after tapping
Destination IP Address field.
11. View Results Press the RESULTS button, to display the Results screen.
12. Turn Laser On If testing an Optical link, select the Laser tab in the lower part of the
screen and press Laser Off. The button will turn Yellow and be
relabeled to indicate the Laser is On.
13. Check LEDs Press the Restart soft key on the Right side of the display to reset test
results. A Green Signal Present LED indicates that the T-BERD is
receiving an optical signal from the near end Ethernet Switch. Green
Sync Acquired and Link Active LEDs indicate that the T-BERD has
successfully connected to the near end Ethernet switch and the Ethernet
link is active.
14. Check ARP Status If you are running a Layer 3 IPv4 Test, verify that the final message in
the Message bar is “ARP Successful. Destination MAC obtained.” If
the message bar displays: “Messages logged,” tap the down arrow next
to “Messages logged” and verify that the final message is “ARP
Successful. Destination MAC obtained.” Click OK to exit the log.
If “ARP Successful” is not displayed, verify that the T-BERD’s IP menu
is configured correctly, as outlined above.
15. Start RFC Press the Enhanced RFC 2544 soft key on the Right side of the Results
screen.
16. Select Config Select the Configs tab. If this is the first time using the RFC2544 test,
tap [New], enter a name for the new configuration, then tap [OK].
Otherwise, choose the saved Test Configuration.