EasyManua.ls Logo

JLG 20AM User Manual

JLG 20AM
98 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
Operation and Safety Manual
ANSI
®
Original Instructions - Keep this manual with the machine at all times.
Model(s)
AM Series
20AM
25AM
30AM
36AM
41AM
P/N - 3121211
November 12, 2014

Table of Contents

Other manuals for JLG 20AM

Question and Answer IconNeed help?

Do you have a question about the JLG 20AM and is the answer not in the manual?

JLG 20AM Specifications

General IconGeneral
Gradeability25%
Ground Clearance3.5 in
Platform Length6 ft 4 in
Platform Width2 ft 6 in
Drive Speed - Elevated0.5 mph
Turning Radius (Inside)0 ft
Raise Time35 sec
Lower Time25 sec
Batteries4 x 6V
Power SourceElectric

Summary

FOREWORD

SAFETY ALERT SYMBOLS AND SAFETY SIGNAL WORDS

Explains safety symbols and signal words used in the manual and on the machine.

SECTION 1 - SAFETY PRECAUTIONS

1.1 GENERAL

Outlines necessary precautions for safe machine operation and maintenance.

1.2 TRANSPORTING

Provides safety guidelines for moving the machine from one location to another.

Tipping Hazards

Details hazards related to machine tipping and precautions to prevent it.

Tilt Back Procedure

Instructions for safely tilting the machine for transport (AM36/AM41 only).

1.3 PRE-OPERATION

Covers essential pre-operation checks and procedures before using the machine.

Electrocution Hazard

Details minimum approach distances to avoid electrocution hazards.

1.4 OPERATION

Provides guidelines and precautions for operating the machine safely.

1.5 MAINTENANCE SAFETY PRECAUTIONS

Safety precautions to follow when performing maintenance on the machine.

SECTION 2 - USER RESPONSIBILITIES, MACHINE PREPARATION, AND INSPECTION

2.1 PERSONNEL TRAINING

Covers training requirements for operators and supervisors.

2.2 PREPARATION, INSPECTION, AND MAINTENANCE

Discusses periodic inspections and maintenance recommendations.

2.3 PRE-START INSPECTION

Details the specific checks to be performed before starting the machine.

2.4 FUNCTION CHECK

Outlines the procedure for checking machine functions before operation.

2.5 DAILY WALK-AROUND INSPECTION

Provides guidelines for performing a daily walk-around inspection of the machine.

SECTION 3 - MACHINE CONTROLS AND INDICATORS

3.2 CONTROLS AND INDICATORS

Details the various controls and indicators on the machine.

Ground Control Station

Describes the controls and indicators located at the ground control station.

Manual Descent Valve

Explains the function and location of the manual descent valve.

Platform Control Station

Describes the controls and indicators located at the platform control station.

SECTION 4 - MACHINE OPERATION

4.4 MACHINE SET-UP AND OPERATION

Guides the operator through the process of setting up and preparing the machine for operation.

Outrigger Installation

Provides step-by-step instructions for installing the outriggers.

4.7 TRANSPORT, LIFTING AND TIE DOWN

Covers procedures for transporting, lifting, and securing the machine.

SECTION 5 - OPTIONAL EQUIPMENT

SECTION 6 - EMERGENCY PROCEDURES

6.2 EMERGENCY OPERATION

Details procedures for emergency operation scenarios.

Operator Unable to Control Machine

Instructions for when the platform operator cannot control the machine.

Platform Caught Overhead

Procedure for rescuing occupants if the platform is jammed overhead.

Righting of Tipped Machine

Steps for safely righting a tipped machine.

6.3 INCIDENT NOTIFICATION

Outlines the procedure for notifying JLG of incidents.

SECTION 7 - GENERAL SPECIFICATIONS AND OPERATOR MAINTENANCE

7.3 OPERATOR MAINTENANCE

Covers operator-level maintenance tasks and recommendations.

Related product manuals