EasyManua.ls Logo

JLG E600J - Page 73

JLG E600J
122 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
SECTION 4 - MACHINE OPERATION
3121710 4-17
3. Rotate the cover to show the inside diameter
4. Install the bolts and torque 6.3 ft. lbs. (8.8 Nm) until they are
flush with the cover.
5. The machine is ready to be towed.
BEFORE THE MACHINE IS SEPARATED FROM THE TOWING VEHICLE, EITHER THE DRIVE
HUB HAS TO BE REENGAGED OR PROPER STEPS MUST BE TAKEN TO PREVENT THE
MACHINE FROM MOVING.
COVER
COVER
ROTATED

Table of Contents