1-10 (No.49793)
2.1.8 Removing the operation switch board
(See Fig.17~19)
• Prior to performing the following procedure, remove the oper-
ation assembly.
(1) Remove the six screws N attaching the button panel on the
operation assembly.
(2) Release the bottom panel from the bottom base at the bot-
tom of the operation switch assembly five joint c and re-
move the bottom panel.
(3) Pull out the operation switch board from inside of the button
panel.
Fig.17
Fig.18
Fig.19
NN
Button panel
CC
Button base
Button panel
Operation switch board
Button panel
w
w
w
.
x
i
a
o
y
u
1
6
3
.
c
o
m
Q
Q
3
7
6
3
1
5
1
5
0
9
9
2
8
9
4
2
9
8
T
E
L
1
3
9
4
2
2
9
6
5
1
3
9
9
2
8
9
4
2
9
8
0
5
1
5
1
3
6
7
3
Q
Q
TEL 13942296513 QQ 376315150 892498299
TEL 13942296513 QQ 376315150 892498299
http://www.xiaoyu163.com
http://www.xiaoyu163.com