INSTALLATION MANUAL
AIR TO WATER HEAT PUMP
SERIES #R290
Question and Answer IconNeed help?

Do you have a question about the Kaisai R290 Series and is the answer not in the manual?

Summary

Safety Instructions Overview

Operation and Repair Warnings

Details specific warnings for operation and repair, including prohibition and shutdown instructions.

Installation and Operation Attention Points

Highlights critical attention points for installation place, unit fixation, and circuit breaker requirements.

Installation Diagrams and Overview

Unit Handling and Installation

Heat Pump Application Scenarios

Selecting the Appropriate Heat Pump

Unit Installation Methodology

Installation Site Requirements

Refrigerant Charging Procedure

Refrigerant Charging Preparations

Steps for preparing the unit before charging the refrigerant, including ventilation and safety.

Final Refrigerant Charging Steps

Instructions for charging the refrigerant and completing the process.

Nitrogen Gas Pressure Verification

Procedure to check the nitrogen gas pressure inside the system before refrigerant charging.

Nitrogen Gas Release and Vacuumizing

Steps for releasing nitrogen gas and vacuumizing the heat pump system.

Water and Power Connection Guidelines

Water Loop Connection Precautions

Key considerations for connecting water pipes, including resistance, cleanliness, and testing.

Power Supply Connection Steps

Guidance on connecting the power supply, wire controller, and auxiliary components.

Optimal Unit Placement Guidelines

Trial Running Procedures

Pre-Trial Running Inspection Checklist

Checklist of inspections required before commencing trial running of the unit.

Trial Running Operational Steps

Steps to follow during the trial running of the heat pump unit.

Unit Maintenance Overview

Daily Use Maintenance Precautions

Essential preparations and precautions for daily use and initial startup of the unit.

Periodic Maintenance Schedule

Preparation for Periodic Maintenance

Steps to take before starting periodic maintenance, including stopping the unit and cutting power.

Fin Heat Exchanger Maintenance

Procedure for inspecting and cleaning the fin heat exchanger for optimal heat exchange.

Plate Heat Exchanger Maintenance

Guidelines for checking and cleaning the water-side plate heat exchanger for scale.

Critical Inspection and Maintenance Dangers

Inspection and Maintenance Danger Preparation

Highlights the risk of fire or explosion due to refrigerant leakage and necessary precautions.

Product Cleaning Procedures

Product Cleaning Guidelines

Methods and agents to use for cleaning the product, avoiding high-pressure water or abrasive cleaners.

Component Inspection Procedures

Technical Specifications and Parameters

Technical Parameters Data

Wiring Diagrams and Schematics

Display ON;OFF Control

Target Temperature Setting Guide

Unit Status Interface

Fault Record Interface

Kaisai R290 Series Specifications

General IconGeneral
BrandKaisai
ModelR290 Series
CategoryHeat Pump
LanguageEnglish