Do you have a question about the Kantech kt-100 and is the answer not in the manual?
Brand | Kantech |
---|---|
Model | kt-100 |
Category | Network Router |
Language | English |
Automatically detects the loop communication speed set at the system workstation.
Supervises power supply conditions and reports 'Low power' status to the system.
Firmware program stored in flash memory can be updated from the system's workstation.
Allows arming/disarming of client alarm systems and enhances security with keypads.
Instructions for unpacking the KT-100 controller and verifying package contents.
Guidelines for choosing an ideal indoor installation location for the controller.
Guidance on installing the suggested KT-PC4204 power supply unit.
Illustrates typical door layout and considerations for door handle installation.
Specific instructions on door handle configuration for access control and safe exit.
Explains the role of door closers in preventing alarms and ensuring proper operation.
Details the function and supervision of door contact sensors for security.
Explains the role of exit detectors and buttons for user exit.
Describes the integrated local alarms for abnormal conditions.
Discusses security implications of reader and keypad configurations.
Wiring instructions for connecting door locking mechanisms to the controller.
How to connect and supervise input zones for sensors and detectors.
Connecting devices to input terminals Z1-Z4 and COM.
Diagram and notes for connecting entry and exit readers.
Considerations for connecting readers and keypads to the controller.
Instructions for connecting control relay outputs for various functions.
Instructions for installing and connecting the tamper switch for cabinet security.
Wiring the controllers for RS-485 network communication.
Instructions for connecting multiple KT-100 units on the RS-485 bus.
Detailed wiring diagram illustrating system connections for the KT-100.
Procedure for performing a hard reset on the controller.
Procedure to test battery backup performance for one hour.
Procedure to test the lithium battery voltage.
Steps to mount the PC4204 and connect the power supply unit.
Connecting inputs and outputs for alarm system integration.