DE Einbau- und Bedienungsanleitung
‘TRESOR‘ Wandeinbauschrank aus Edelstahl
Fig. 210 und Fig. 214
EN Installation and operating instructions
‘TRESOR‘ stainless steel built-in wall cabinet
Fig. 210 and Fig. 214
2
9
Question and Answer IconNeed help?

Do you have a question about the Kemper TRESOR and is the answer not in the manual?

Kemper TRESOR Specifications

General IconGeneral
BrandKemper
ModelTRESOR
CategoryIndustrial Equipment
LanguageEnglish

Summary

Precautions for Installation and Operation

Installation and Operation Guidelines

Follow manual instructions, use qualified plumbers, and pass manual to owner.

Usage and Safety Warnings

Use as intended; follow all warnings to prevent injury or material damage.

Important Operator Advice

Details on material, pressure rating, chlorine environments, and proper condition of use.

Lock Replacement and Technical Notes

Door lock can be replaced; electrical/plumbing work requires specialists.

Maintenance and Cleaning Recommendations

Regular cleaning with stainless steel cleaner; avoid abrasive agents.

Installation Environment and Testing

Install in dry, frost-free rooms; perform leak and functional tests before completion.

Warranty Void Conditions

Warranty voided by incorrect installation, unauthorized modifications, or improper operation.

Country-Specific Regulations and Disposal

International Usage Restrictions

Check country-specific rules for water/electric combination units outside Germany.

Environmental Considerations

Specific cleaning required for pools or similar ambient conditions.

Product Disposal Guidelines

Follow local regulations; do not dispose of with household waste.

Electrical Safety Requirements

Residual Current Circuit Breaker (RCD) Requirement

Use RCD (0.03A) for power/water connections as per VDE standards.

Wall Opening and Recess Requirements

Wall Opening Dimensions

The wall opening must be 510 x 290 mm (Height x Width).

Heat Insulation Considerations

Consult architect for heat insulation, factoring into installation depth.

Fire Protection Measures

Develop fire protection concept with surveyor/planner for wall opening.

Depth and Wall Thickness Specifications

Notes on minimum/maximum depth, wall thickness for frost protection, and pipe laying.

Built-in Wall Cabinet Installation

Power Supply and Protection

Note on RCD (≤ 0.03A) and connection current (≤ 32A), IP 44 protection.

Earthing Connections

Connect earthing to cabinet screws and building metallic parts.

IP 55 Protected Models

Lists specific models delivered with IP 55 protection.

Cabinet Fitting and Wall Compensation

Account for outer façade construction; trim frame allows 20mm compensation.

Insulation and Fixing

Install rear insulation, fix cabinet with screws, considering wall thickness.

Fire Protection Lagging Installation

Install fire protection lagging in masonry recess before inserting the cabinet.

Component Installation Procedures

Socket Combination Installation

Screw socket combination onto mounting plate and attach to cabinet wall.

Frost-Proof Outer Fitting Installation

Install fitting into hole, connect to water supply, and attach spray protection plate.

Detailed Component Installation

Frost-Proof Outer Fitting Installation (Exposed;Concealed)

Install fitting, connect to water supply, and attach spray protection plate.

Trim Frame with Door Installation

Slide trim frame with door over guide slots and secure with screws.

Functional Testing and Frost Safety

Frost-Proof Outer Fitting Testing

Conduct functional testing of the frost-proof outer fitting.

Automatic Draining and Gentle Closing

Fitting auto-drains; close gently after water removal for frost safety.

Frost Period Preparations

Remove hoses and attachments before the frost period to ensure frost safety.