KD GEMINI – INSTALLATION/OPERATION MANUAL
KD Gemini May-06
11
7.0 BLOWER REMOVAL
Kerr furnaces have a blower sealing system, which is designed to be tight and rattle free
(Figure - 2). Use a reversing drill with 1/4” hex drive for the sheet metal screws.
1. Shut off oil and power to furnace.
2. Open blower compartment and if necessary remove lower rear filter support.
3. Disconnect wiring to blower motor.
4. Remove the #8 (1/4”) hex drive sheet metal screws securing the blower sides to
the divider panel.
5. Remove the rear 5/16” blower mount nuts.
6. Lift the blower straight up, keeping it level to avoid jamming on the blower mount
bolts and center panel. Shift the blower out of the furnace.
Secure casing insulation with aluminum foil tape to ease blower re-installation. Replace
the blower assembly using the reverse procedure. Ensure wiring and ground wire are
correctly reconnected.
8.0 BURNER SPECIFICATIONS
Input Pump Output
Heating
cfm@
Blower
Speed
Model Burner
USGPH
L/h
Nozzle
(psi)
Air
Setting
Turbulator
Btu/h kW
0.2"wc
0.5"wc
0.2"wc
0.5"wc
0.75 2.84
0.60 60B 3.5 0.0 88,000 26 850 950 4 3
0.92 3.48
0.75 60W
150
5.0 1.5 105,000
31 1080 1200 3 2
KDF(R)E-
115(A3)
Riello 40 F3
1.00 3.81
0.75 60W 175 5.0 1.5 116,000
34 1080 1300 3 1
KDF(R)E-
130(A3)
1.10 3.48
0.85 60B 170 3.2 2.0 128,000
37 1520 1300 1 1
1.10 3.48
0.85 60B 170 3.2 2.0 128,000
37 1520 1
KDF(R)E-140
Riello 40 F5
1.22 2.78
1.00 60B 150 3.5 2.0 140,000
41 1520 1
0.59 3.48
0.50 60B 8.0/0.0* 70,000 21 850 740 4 4
0.71 0.60 60B 6.0/1.0* 84,000 25 850 950 4 3
0.77 0.65 60B 7.5/1.0* 90,000 26 850 950 4 3
0.89 0.75 60B 6.5/0.0 105,000
31 1080 1200 3 2
KDF(R)G-
115(A3)
Beckett AFG
PA#402
1.01 3.94
0.85 60B
140
9.0/1.0 117,000
34 1330 1300 2 1
0.75 3.48
0.60 70B 7.0 0.0 88,000 26 1080 1200 3 2
KDF(R)V-
095(A3)
Riello 40
BF3**
0.80 3.94
0.65 60ARD
150
6.5 3.0 94,000 28 1080 1200 3 2
KDF(R)V-
110(A3)
0.92 2.69
0.75 70B 4.2 1.5 108,000
32 1330 1300 2 1
KDF(R)V-
130
Riello 40
BF5**
1.04 3.36
0.85 60W
150
5.2 2.0 122,000
36 1520 1
* Low firing rate baffle required ** Direct Vent BF3 and BF5 - 4” Vent
Use Delavan nozzles. Use turbulator and air settings as a guide. Set flame to #0
smoke before CO
2
test. When there is a discrepancy between the information from the
burner manufacturer and Kerr Heating Products, the Kerr data shall be used.