PARADIGM
HIGH EFFICIENCY OIL-FIRED
CONDENSING FURNACE
Installation, Operation and
Maintenance Manual
INSTALLATIONS MUST MEET ALL LOCAL AND FEDERAL
CODES THAT MAY DIFFER FROM THIS MANUAL
Please read this complete manual before beginning installation. These instructions must be
kept with the furnace for future reference.
CERTIFIED TO: CAN/CSA Std. B140.0, Std. B140.4, & UL 727
KERR ENERGY SYSTEMS
PO Box 637
12118 HWY 209
Parrsboro Nova Scotia Canada
B0M 1S0
www.KerrEnergySystems.com