14
EN
4 - INSTALLING THE PRODUCT
4.1 - Manual running
4.2 - Installing
3 - PRELIMINARY CHECKS
eore he insallaion sars we sues o carry ou ollowin
inspections and operations:
the gate framework must be strong and suitable;
the gate must not show too many sideways slide skids during the
running;
the system of wheels/lower rail and roller/upper runner must work
without too many frictions;
to avoid the gate derailment you must install the stop beats of the
sliding, whether at the opening or closing, and a second upper
roller/runner in full observance of the current law;
remove any manual lock in the beforehand gates;
take on the gate bottom the feed raceway of the feeding cables
mm and o eernal connecion phoocell ashlih key
selector, etc...).
Insert the key and turn it 90° in anticlockwise direction.
especin he oerall size o round he baseplae hrouh
surdy screwanchors or drown i ino he concree
N he eac dimensions o he rack mus be known o allow precise calculaion o he counerplae posiion
Pull the knob till it is perpendicular to the gearmotor.
Plan for one or more sheathing for the passage of the power lines.
Fig. 2
Fig. 3 Fig. 4
N ake care o reenae he earmoor beore sarin i up nain wih he moor runnin may damae is inernal componens