EasyManuals Logo

Key Automation SC-50 User Manual

Key Automation SC-50
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #15 background imageLoading...
Page #15 background image
15
EN
4.4 - Rack assembling
ake he lid ounscrewin he screws  u he earmoor on
he plae nser he wo socke head screws 
It is important to lock the two socket head screws forcefully, making
sure, that the gearmotor is steady on the ground, during the whole
gate running.
elease he earmoor as indicaed by he  and open enirely
the gate.
Put a rack element on the pinion gear and fasten it to the gate with
screw and spacing bars.
Move the gate manually bringing the pinion gear into line with the
last spacing bar.
Fasten the rack element for good.
 he reulain allowed by he rack is no sucien i is possible o
counterbalance the gearmotor high working on the four screws

he screws should be ihened aain aer he moor has been
operated a few times.
For a correct positioning of the other elements and to assure their
straightness, it is necessary to employ a rack element using it as
suppor and reerence 
It is besides necessary to assure an aperture of 2 mm between
rack and pinion gear, so that the gate weight doesn’t rest on the
earmoor pinion ear 
Fig. 8
Fig. 9
4.3 - Fixing
Fig. 5 Fig. 6 Fig. 7
2mm
89mm
89mm
25mm
90mm

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Key Automation SC-50 and is the answer not in the manual?

Key Automation SC-50 Specifications

General IconGeneral
BrandKey Automation
ModelSC-50
CategoryGate Opener
LanguageEnglish

Related product manuals