EasyManua.ls Logo

Klarstein Luminance Steam - Building In Procedure

Klarstein Luminance Steam
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
49
EN
Installation dimensions
Building in
Do not hold or carry the appliance by the door handle. The door handle cannot hold
the weight of the appliance and may break off.
1. Carefully push the oven into the box, making sure that it is in the centre.
2. Open the door and fasten the oven with the screws that were supplied.
Note: There should be gap above the oven.
10
25
Fully insert the appliance and centre it.
Do not kink the connecting cable.
Screw the appliance into place.
The gap between the worktop and the appliance must not be closed by additional
battens.
Ventilation openings
behind, min 250 cm
2
Back
panels
opening
50
460
min 45
Ventilation grid Cupboard feet
min 45

Related product manuals