EasyManua.ls Logo

Knight 80 - Page 9

Knight 80
72 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Installation & Operation Manual
9
1 Determine boiler location (continued)
RECOMMENDED SERVICE CLEARANCES:
FRONT - 24”
TOP - 24”
LEFT SIDE - 24”
REAR - 24”
Figure 1-2 Alcove Installation - Minimum Required Clearances
RECOMMENDED SERVICE CLEARANCES:
FRONT - 24”
TOP - 24”
LEFT SIDE - 24”
REAR - 24”
Figure 1-1 Closet Installation - Minimum Required Clearances
WARNING
For closet installations, CPVC
material MUST BE used in a closet
structure due to elevated
temperatures. Failure to follow this
warning could result in fire,
personal injury, or death.
WARNING
For alcove installations, CPVC
material MUST BE used in an
alcove structure due to elevated
temperatures. Failure to follow this
warning could result in fire,
personal injury, or death.

Table of Contents

Other manuals for Knight 80

Related product manuals