13
LCD Setting
General Setting
After pressing and holding “ ” button for 3 seconds, the unit will enter setting mode. Press “ ” or “ ”
button to select setting programs. And then, press “ ” button to confirm the selection or “ ” button to
exit.
Setting Programs:
Output source priority:
To configure load power
source priority
Utility will provide power to the
loads as first priority.
Solar and battery energy will
provide power to the loads only
when utility power is not available.
Solar energy provides power to the
loads as first priority.
If solar energy is not sufficient to
power all connected loads, utility
power will supply power the loads
with solar at the same time.
Battery energy provides power to
the loads only when solar energy
and utility power are not available.
Solar energy provides power to the
loads as first priority.
If solar energy is not sufficient to
power all connected loads, battery
energy will supply power to the
loads at the same time.
Utility provides power to the loads
only when battery voltage drops to
either low-level warning voltage or
the setting point in program 12.
Maximum charging
current: To configure total
charging current for solar
and utility chargers.
(Max. charging current =
utility charging current +
solar charging current)
Setting range is from 10A to 100A
and increment of each click is 10A.