EasyManua.ls Logo

Kodak ThermoFlex Wide II - Page 38

Kodak ThermoFlex Wide II
42 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
34 Appendix B: Site Inspection Checklist
12. C the room’s humidity control system handle the moisture load generated by
the processor line?
13. Is the installation area flat to the required specification? (See Floors on page 11.)
14. Does the floor meet the maximum peak loading specification? (See Floors on
page 11.)
15. Is there large machinery or a forklift throughway inside the site, or any traffic or
industry near the site that may transmit vibration to the device? (See Floor
Vibration on page 12.)
Ye s N o
Comments:
Ye s N o
Comments:
Ye s N o
Comments:
Ye s N o
Comments: