36 Appendix B: Site Inspection Checklist
21. Is the air supply filtered and dried as per specification? (See Air Supply on
page 15.).
22. Are the voice and data telephone lines installed?
23. What type of network connection is used?
24. What are the three consecutive TCP/IP addresses that are to be used for the
MCE and RAS connection? (See Network on page 20.)
Follow Up
Is follow-up required?
The outstanding items from the Site Requirements list are:
Yes No Prefilter ordered
Comments:
Yes No Modem number:
Comments:
1.
2.
3.
No The location described in this document meets all criteria for a
timely and successful installation of the ThermoFlex Wide II device.
Yes Some follow-up is required to ensure that the site requirements are
met prior to the installation of the device.