242 Section 13 Generator Management Information TP-6953 7/19
When the load decreases below the Stop Load Level f or
Generator 3, Generator Management will begin the stop
delay. When the stop delay expires, Generator 3 will soft
unload and disconnect from the paralleling bus, leaving
only Generators 1 and 2 to supply the load (see
Figure 13-6).
Figure 13 -6 Generators 3 and 4 are Stopped by Generator Management
The load increases to a level above the Stop Load Level
for Generator 3, but the system will not respond to the
load increase until the load exceeds the Start Load Level
of Generator 3 (see Figure 13-7).
Figure 13 -7 Load Increases After Generator 3 Stops