TP-6391 9/0842 Section 4 Controller
Volts,
Hz
Market
Engine
Type
Data
Inputs
CO
Battery
Voltage
CANbus
Comm.
ar
ne
aso
ne
Model
req.
Hz
Voltage, Phases
Uu* Uc Ec
Ed[
CO Bt
Cn]
230 V, 1 Ph, 2 W 2
4EFCD 50
115/230 V, 1 Ph, 3 W 6
115V,1Ph,2W 5
120/240 V, 1 Ph, 3 W 1
5ECD 60
120 V, 1 Ph, 3 W 0
ECD
120 V, 1 Ph, 2 W 0
EFCD
230 V, 1 Ph, 2 W 2
0 4 0 1 12
2or8]
6EFCD 50
115/230 V, 1 Ph, 3 W 6
115V,1Ph,2W 5
120/240 V, 1 Ph, 3 W 1
7.3ECD 60
120 V, 1 Ph, 3 W 0
120 V, 1 Ph, 2 W 0
* Use voltage/frequency parameters Uu07--Uu23 only with ADC application program version 1.20 or higher.
[ See Figure 4-19 for Ed settings with optional sender kits.
] See Figure 4-20 for Cn settings with optional digital gauges (gauges are a vailable on selected models only).
Note: Replacement controllers from Kohler Aftermarket Parts are shipped with factory settings for the 8.5/12RES.
Note: Setting the Ec parameter automatically selects the Ed parameter for the standard data inputs for that engine.
If you change Ec, check the Ed setting.
Figure 4-18 Configuration Parameters
Model Sender Kit Ed
5
7.3ECD
None 0
.
4/6EFCD
GM45891-KA1 * No Change
* OP and WT sender kits
Figure 4-19 Ed Settings with Optional Sender Kits
Gauge Kit Gauge Description
Cn
Setting
Power Down
Time (when
master switch in
AUTO position)
Description
None — Cn00 48 hours No CAN communication (not for use with these models)
GM32337-KP1 Remote Digital Gauge for
Marine
Cn01 Never/None 3-inch J1939 gauge with no sleep mode
CAN communication (not for use with these models)
GM46035-KP1 Three-Inch Digital Gauge
Cn02 48 hours
Smartcraftt 3-inch gauge for generator set #1 with ECM [
Cn03 48 hours
Smartcraftt 3-inch gauge for generator set #2 with ECM [
Cn04 48 hours
Smartcraftt 3-inch gauge for generator set #3 with ECM [
Cn05 48 hours
Smartcraftt 3-inch gauge for generator set #4 with ECM [
Cn07 48 hours
Smartcraftt 3-inch gauge for generator set #1 without ECM [
(not for use with these models)
GM50822-KP1 Two-Inch Digital Gauge
Cn08
1 hour w Smartcraftt 2-inch gauge for generator set #1 with ECM ]
Cn09
1 hour w Smartcraftt 2-inch gauge for generator set #1 without ECM ]
(not for use with these models)
* For ADCs with removable power mode jumpers, refer to TT-1439 for power down information.
[ Smartcraftt settings for ADC code version 2.00 or higher only, for models 5/7.3ECD and 4/6EFCD.
] Smartcraftt settings for ADC code version 2.20 or higher only.
w Before ADC code version 3.20, the power-down time was 48 hours.
SmartCraftt is a trademark of Mercury Marine, a division of Brunswick Corporation.
Figure 4-20 Communication Parameter Cn Settings (optional gauges are available on selected models only)