EasyManuals Logo
Home>Kohler>Engine>CH11-16

Kohler CH11-16 User Manual

Kohler CH11-16
116 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #74 background imageLoading...
Page #74 background image
8.27
Section 8
Electrical System and Components
8
Test 4 Solenoid Hold-In Coil/Contact Continuity Test
Use an ohmmeter set to the audible or Rx2K scale, and
connect the two ohmmeter leads to the two large post
terminals. Perform the preceding test (3) and check for
continuity. See Figure 8-61. The meter should indicate
continuity, if no continuity is indicated the solenoid
should be replaced. Repeat test several times to
confirm condition.
Figure 8-61. Testing Hold-In Coil/Solenoid Contact
Continuity.
Plunger
Pushed In
VOM Meter
Leads
12 volt Test Leads

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Kohler CH11-16 and is the answer not in the manual?

Kohler CH11-16 Specifications

General IconGeneral
BrandKohler
ModelCH11-16
CategoryEngine
LanguageEnglish

Related product manuals