EasyManua.ls Logo

Kohler Command PRO ECH650 - Install Air Cleaner Assembly; Setting Initial Governor Adjustment

Kohler Command PRO ECH650
154 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
10
10.23
Section 10
Reassembly
Install Air Cleaner Assembly
Refer to Section 4 for the air cleaner reassembly
procedure.
Heavy-Duty Air Cleaner
1. Install the air cleaner assembly onto the thro le
body mounting studs. Secure with three hex
ange nuts and two hex ange screws. Torque the
hex ange nuts to 7.4-9.0 N·m (65.5-80 in. lb.) and
torque the screws to 4.6-6.9 N·m (41-61 in. lb.).
See Figure 10-82.
Figure 10-82. Torquing Hex Nuts.
Low-Pro le Air Cleaner
1. Verify O-ring is present around the machined
O.D. of the thro le body and place air cleaner
base onto thro le body studs. Secure the air
cleaner base using three hex ange nuts. A ach
the air cleaner base bracket to the cylinder heads
with four hex ange screws behind any control
panel or bracket. A ach the air cleaner base
to the lower bracket with the two M5 screws
through the lower section of the base. Torque
the hex ange nuts to 6.2-7.3 N·m (55-65 in. lb.),
and the two lower M5 mounting screws (when
applicable) to 4.0 N·m (35 in. lb.). See Figures
10-83 and 10-84.
Figure 10-84. Low-Pro le Air Cleaner and Bracket.
2. Install the air cleaner components as described in
Section 4.
Setting Initial Governor Adjustment
1. Move the governor lever toward the thro le
body as far as it will go (wide-open thro le) and
hold in position.
2. Insert a nail into the hole on the cross sha and
rotate the sha counterclockwise as far as it
will turn, then torque the hex nut to 7.1 N·m
(63 in. lb.). See Figure 10-85.
Torque 3 Nuts
Torque 3 Nuts
Torque Screws
Torque Screws
Figure 10-83. Torquing Base Mounting Nuts.
Bracket Screws
Bracket Screws
Base Screws
Base Screws
Bracket
Bracket

Related product manuals