EasyManua.ls Logo

Kohler Command PRO ECV730 - Air Cleaner Assembly Installation

Kohler Command PRO ECV730
152 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
10.23
Section 10
Reassembly
10
Torque Hex
Flange Nuts
Install Air Cleaner Assembly
Refer to Section 4 for the air cleaner reassembly
procedure.
Heavy-Duty Air Cleaner
1. Install the air cleaner assembly onto the thro le
body mounting studs. Secure and torque the hex
ange nuts to 7.4-9.0 N·m (65.5-80 in. lb.). See
Figure 10-86.
Figure 10-85. Throttle Control Bracket Detail.
Figure 10-86. Torquing Hex Nuts.
2. Install and tighten the two upper mounting
screws securing the air cleaner to the mounting
bracket. Torque the screws to 9.9 N·m
(88 in. lb.). See Figure 10-87.
Figure 10-87. Installing Upper Mounting Screws.
Low-Pro le Air Cleaner
1. Verify O-ring is present around the machined
O.D. of the thro le body and place air cleaner
base onto thro le body studs. Secure the air
cleaner base using three hex ange nuts. A ach
the air cleaner base bracket to the cylinder heads
with four hex ange screws behind any control
panel or bracket. A ach the air cleaner base to the
lower bracket with the two M5 screws through
the lower section of the base. Torque the hex
ange nuts to 7.4-9.0 N·m (65.5-80 in. lb.), and the
two lower M5 mounting screws to 2.3 N·m
(20 in. lb.). See Figures 10-88 and 10-89.
Item Description
1 Bracket, speed control
2 Clamp, cable
3 Lever, throttle control (top)
4 Lever, throttle actuator (bottom)
5 Screw, M5x0.8x20
6 Washer, spring
7 Washer, at (2)
8 Spring, return
9 Nut, M5x0.8 lock
1
1
2
2
3
4
4
5
5
9
8
7
6

Related product manuals