5. Complete the Installation
IMPORTANT! Wait at least 10 seconds after the last test flush
before installing the tank lid. Hold your hand over the sensor for 1-2
seconds after installing the lid to confirm proper operation.
NOTE: If you are unable to activate the sensor immediately after
installing the tank lid, wait a minimum of 5 minutes for the sensor
to calibrate.
Install four pads, two on the front (not shown) and two on the
back, near each corner of the tank lid or tank rim where the lid
contacts the tank rim. The pads stabilize the lid to prevent false
flushes when the lid is bumped.
Install the tank lid.
Hold your hand approximately 1 (25 mm) above the module.
The toilet will flush.
Consult the troubleshooting chart for operation or performance
issues.
Emblem
Sensor Indicator
Pad
Pad
Kohler Co. 7 1224637-2-E