EasyManua.ls Logo

Komatsu D32P-1 User Manual

Komatsu D32P-1
184 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
Operation & Maintenance
Manual
CEAMOO0700
D32E,P=l
D38E,P=i
Dl!E,P=i
BULLDOZER
D32E,P=l n PO75501
SERIAL NUMBERS
D38E,P-1 n PO85501 andup
D39E,P-1 - PO95501
This material is propri8tary to Komatsu America international Company and is not to be reproduced, used, or
disclosed except in accordance with written authorization from Komatsu America International Company.
It is our policy to improve our products whenever it is possible and practical to do so. We reserve the right to make
changes or add improvements at any time without incurring any obligation to install such changes on products sold
previously.
Due to this continuous program of research and development, periodic revisions may be made to this publication.
It is recommended that customers contact their distributor for information on the latest revision.
October 1996
Copyright 1996 Komatsu America International Company

Table of Contents

Other manuals for Komatsu D32P-1

Question and Answer IconNeed help?

Do you have a question about the Komatsu D32P-1 and is the answer not in the manual?

Komatsu D32P-1 Specifications

General IconGeneral
BrandKomatsu
ModelD32P-1
CategoryExcavators
LanguageEnglish

Summary

Safety Information

Signal Word Definitions

Defines hazard alert words used for safety messages and product graphics.

General Precautions

Safety Rules

General rules for safe operation and maintenance of the machine.

Safety Features

Information on using safety features like lock levers and seat belts.

Precautions During Operation

Before Starting Engine

Pre-start checks and safety procedures before operating the machine.

Operating Machine

Safe operating practices and considerations during machine use.

Precautions for Maintenance

Before Carrying Out Maintenance

Safety procedures and precautions before starting maintenance tasks.

During Maintenance

Safety procedures and precautions to follow while performing maintenance.

Operation

Checks Before Starting Engine

Pre-operation checks required before starting the engine.

Starting Engine

Procedures for safely starting the machine's engine.

Operation (Continued)

Moving Machine

Instructions and safety precautions for moving the machine.

Steering Machine

Instructions and safety precautions for steering the machine.

Parking Machine

Safe procedures and precautions for parking the machine.

Stopping Engine

Procedures for safely stopping the machine's engine.

Shifting Gear

Procedures for changing gears while operating the machine.

Stopping Machine

Procedures and safety precautions for stopping the machine.

Check After Finishing Work

Post-work checks to ensure the machine is properly secured.

Check After Stopping Engine

Post-stop checks to ensure the engine is properly shut down.

Transportation

Transportation (Continued)

Cold Weather Operation

Cold Weather Operation (Continued)

Troubleshooting

Troubleshooting (Continued)

Other Trouble

General troubleshooting categorized by system (Electrical, Chassis, Engine).

Guides to Maintenance

Maintenance Safety Precautions

Safety measures for fire prevention, handling parts, and cleaning.

Wear Parts List

Use of Fuel, Coolant and Lubricants by Ambient Temperature

Proper Selection of Fuel, Coolant and Lubricant

Guidelines for choosing appropriate fluids based on ambient temperature.

Use of Fuel, Coolant and Lubricants (Continued)

Standard Tightening Torques

Standard Tightening Torques (Continued)

Periodic Replacement of Critical Parts

Maintenance Schedule Chart

Initial 10 Hours Service

Tasks for the first 10 hours of machine operation.

Initial 50 Hours Service

Tasks for the 50-hour service milestone.

Service Procedure

Initial 10 Hours Service Procedures

Specific procedures for the initial 10-hour service interval.

Service Procedure (Continued)

Initial 50 Hours Service Procedures

Specific procedures for the initial 50-hour service interval.

Track Tension and Adjustment

Procedures for checking and adjusting track tension.

Every 10 Hours Service (Check Before Starting)

Procedures for frequent checks performed every 10 hours.

Every 50 Hours Service

Procedures to be performed at the 50-hour service interval.

Every 250 Hours Service

Procedures to be performed at the 250-hour service interval.

Every 500 Hours Service

Procedures to be performed at the 500-hour service interval.

Every 1000 Hours Service

Procedures to be performed at the 1000-hour service interval.

Every 2000 Hours Service

Procedures to be performed at the 2000-hour service interval.

Drain, Flush and Refill Cooling System

Procedure to drain, flush, and refill the cooling system.

Specifications

D32E-1, D32P-1 Specifications

Technical specifications for D32E-1 and D32P-1 models.

D38E-1, D38P-1 Specifications

Technical specifications for D38E-1 and D38P-1 models.

Specifications (Continued)

Related product manuals