EasyManua.ls Logo

Komatsu PC750LC-7 - Every 100 Hours Maintenance

Komatsu PC750LC-7
341 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
.
MAINTENANCE
MAINTENANCE PROCEDURE
EVERY 100 HOURS MAINTENANCE
Maintenance for every 10 hours service should be carried out at
the same time.
LUBRICATING SWING CIRCLE
(4 points)
1. Lower the work equipment to the ground.
2.
Using a grease pump, pump in grease through the grease
fittings shown by arrows.
3. After greasing, wipe off any old grease that was pushed out.
4 - 46

Table of Contents