Do you have a question about the lancer DELTA and is the answer not in the manual?
Turn power OFF, disconnect dispenser, pull PCB upward, and secure terminal block with tape to prevent shock.
Disconnect Ice Bank (J2) and Carbonator (J3) probes from the board.
Short Ice Bank probe terminals (J2) and measure continuity with an Ohm meter.
Reconnect power, observe continuity for J2 (3-2) and J2 (3-1), and listen for relay clicks.
Turn power OFF/ON to reset Carbonator timer. Short Carbonator probe terminals (J3) and measure continuity for J3 (3-2).
If all tests pass, the board is functional. Remove tape, reconnect, or replace PCB if non-conformities are found.
Turn power OFF, disconnect dispenser, pull PCB upward, and secure terminal block with tape to prevent shock.
Disconnect Ice Bank (J2) and Carbonator (J3) probes from the board.
Short Ice Bank probe terminals (J2) and measure continuity with an Ohm meter.
Reconnect power, observe continuity for J2 (3-2) and J2 (3-1), and listen for relay clicks.
Turn power OFF/ON to reset Carbonator timer. Short Carbonator probe terminals (J3) and measure continuity for J3 (3-2).
If all tests pass, the board is functional. Remove tape, reconnect, or replace PCB if non-conformities are found.
| Frequency | 50/60 Hz |
|---|---|
| Protection | Overload |
| Communication | Modbus RTU |
| Enclosure | NEMA 4X |
| Voltage Rating | 208-600 VAC |
Loading...