Heartland Owners Forum http://manuals.heartlandowners.org
Landmark 365 User Guide V1.1.pdf P a g e | 44 Version 1.1, March 10, 2016
Prioritization of Load Shedding
In the example table above, the left-most column shows the Power Control System relay number
associated with each device. The fifth column from the left identifies which power leg that relay is
associated with. The right-most column shows the order in which loads are shed. Water Heater is shed
first. Rear A/C is shed second. Front A/C is shed third, and so on. Your coach setup may differ from this
example.
Note that when the A/C loads are shed, the blowers continue to run, but the compressors are shut off.
Line Status
The line status display shows the number of amps currently being used on each leg of the incoming
power.
Entertainment Center
Watching Cable TV
Signal booster
The coax from the over-the-air antenna and the coax from the cable TV input are both fed into a signal
booster usually located in a cabinet to the left of the bedroom TV, or in the front bedroom closet.