fi gure 35
fi gure 43
fi gure 45
fi gure 44
fi gure 46
fi gure 34
fi gure 37
fi gure 39
fi gure 41
fi gure 42
fi gure 36
fi gure 38
fi gure 40
1. Attach the auto ratchet blocks to the
respective shroud anchor points using the
long D shackles. Please note that this is
designed to be a tight fi t.
(fi gure 34)
2. Pass the gennaker pole through the
retaining ring on the port side of the
striker bar and place the pin into the
mast foot fi tting as shown.
(fi gure 35)
3. Unscrew the plastic button fi tting on
the end of the gennaker pole and slide the
jubilee clip and gennaker chute on to the
pole. Replace the plastic button fi tting as
shown.
(fi gure 36)
4. Find the point where the gennaker chute
mouth sits with the aft edge of the mesh
bag fi nishing approximately 100 mm in
front of the main beam and tighten jubilee
clip with the screw hidden under the pole.
(fi gure 37)
5. Tie the gennaker chute line to the port
hull as shown.
(fi gure 38)
6. Lace the aft end of the gennaker chute
bag through the “P” clip riveted on the
front face of the main beam and around the
mast ball neck as shown.
7. read the gennaker tack line through
the cam cleat positioned on the port side of
the mast ball and tie a double stopper knot
at the end of the line. (
fi gure 39)
8. Tie the forward pole brace lines from
the end of the gennaker pole to the forestay
chain plates at the front of
both hulls. ese lines should be tight
inducing approximately 50-75 mm of
negative prebend in the gennaker pole.
(
fi gures 40 & 41)
9. Tie the middle pole brace lines from the
pole just aft of the retaining ring to the
forestay chain plates at the front of both
hulls. ese lines should be tight inducing
approximately 50-75 mm of negative
prebend in the gennaker pole. (
fi gure 42)
10. Using a bowline, tie the corner of the
gennaker marked “tack” to the tack line
exiting from the front of the gennaker pole.
Ensure there is a double stopper knot tied in
the tack line approximately 50 mm prior to
your bowline to ensure the gennaker fl ies
cleanly without the sail fouling the end of
the pole.
(fi gure 43)
11. Tie the up haul end of the gennaker
halyard to the head of the gennaker using
a bowline.
(fi gure 44)
12. As depicted by the diagram: read the
downhaul end of the gennaker halyard
through the uphaul cam cleat (positioned on
the front beam on the port side of the tack line
cleat), round the gennaker downhaul turning
block (tied on a piece of elastic to the port toe
strap aft mounting), through the hole in the
aft end gennaker chute sock, fi nally exiting
through the gennaker chute mouth.
13. Pass the downhaul through the lower
downhaul patch ring traveling in a vertical
direction toward the upper downhaul patch.
(fi gure 45)
14. Tie the downhaul o to the upper
downhaul patch using a bow line.
(fi gure 46)
9. Gennaker
Halyard
up mast
To gennaker tack
To
gennaker
downhaul
patch