EasyManua.ls Logo

LEGRAND IME NEMO D4-ec - Connection Sequence Verification; Voltage and Current Phase Sequence Checks

LEGRAND IME NEMO D4-ec
40 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
24
La sequenza corretta delle Fasi di Tensione è: 2 5 8
(V1 al morsetto 2); (V2 al morsetto 5); (V3 al morsetto 8)
La sequenza corretta delle Fasi di Corrente è: 1.3 4.6 7.9
come indicato in Fig.1
The correct sequence of the Voltage Phases is: 2 5 8
(V1 at terminal 2); (V2 at terminal 5); (V3 at terminal 8)
The correct sequence of the Current Phases is: 1.3 4.6 7.9,
as shown in Fig.1
La séquence correcte des Phases de Tension est: 2 5 8
(V1 à la borne 2); (V2 au terminal 5); (V3 au terminal 8)
es Phases Actuelles est: 1.3 4.6 7.9,
comme indiqué sur la Fig.1
Die korrekte Reihenfolge der Spannungsphasen lautet: 2 5 8
(V1 an Klemme 2); (V2 an Klemme 5); (V3 an Klemme 8)
Die korrekte Reihenfolge der aktuellen Phasen lautet:
1.3 4.6 7.9, wie in Fig.1
La secuencia correcta de las Fases de Voltaje es: 2 5 8
(V1 en la terminal 2); (V2 en la terminal 5); (V3 en la terminal 8
La secuencia correcta de las Fases Corriente es: 1.3 4.6 7.9,
como se muestra en la Fig.1
9
3
6
I1
Fig.1
Fig.2
1.3 = I1
OK
3.1 = - I1
No OK
I1
1
4
7
I3
I2
I1
3
1
I1
I1
3
1
I1
Sequenza di collegamento • Connection sequence • Séquence de
connexion• Verbindungssequenz • Secuencia de conexión
V1
V2
V3
2
5
8
N

Related product manuals