DANGER OF EXPLOSION!
Fumes from PVC glue may ignite during system check.
Allow fumes to dissipate for at least 5 minutes before
placing unit into operation.
DANGER
1. Measure and cut vent pipe to desired length.
2. Debur and chamfer end of pipe, removing any ridges
or rough edges. If end is not chamfered, edge of pipe
may remove cement from tting socket and result in a
leaking joint.
3. Clean and dry surfaces to be joined.
4. Test t joint and mark depth of tting on outside of pipe.
5. Uniformly apply a liberal coat of PVC primer for PVC
or use a clean dry cloth for ABS to clean inside socket
surface of tting and male end of pipe to depth of tting
socket.
NOTE: Time is critical at this stage. Do not allow
primer to dry before applying cement.
6. Promptly apply solvent cement to end of pipe and
inside socket surface of tting. Cement should be
applied lightly but uniformly to inside of socket. Take
care to keep excess cement out of socket. Apply
second coat to end of pipe.
7. Immediately after applying last coat of cement to pipe,
and while both inside socket surface and end of pipe
are wet with cement, forcefully insert end of pipe into
socket until it bottoms out. Turn PVC pipe 1/4 turn
during assembly (but not after pipe is fully inserted) to
distribute cement evenly. Do not turn ABS or cellular
core pipe.
NOTE: Assembly should be completed within 20
seconds after last application of cement. Hammer
blows should not be used when inserting pipe.
8. After assembly, wipe excess cement from pipe at end
of tting socket. A properly made joint will show a bead
around its entire perimeter. Any gaps may indicate
an improper defective assembly due to insufcient
solvent.
9. Handle joints carefully until completely set.
Table 3. Outdoor Termination Kits Usage
Capacity
VENT
PIPE DIA.
(in.)
STANDARD CONCENTRIC
Outdoor Exhaust
Accelerator
(Dia. X Length)
Outdoor
Exhaust
Accelerator
(Dia. X Length)
Flush
Mount Kit
1-1/2”
Concentric
Kit
2”
Concentric
Kit
3”
Concentric
Kit
1-1/2” X 12” 2” X 12” 51W11 **
71M80
or
+44W92++
69M29
or
+44W92++
60L46
or 44W93+
045
2 YES YES YES
2-1/2 YES YES YES
3 YES YES YES
070
2 YES YES YES
2-1/2 YES YES YES
3 YES YES YES
090
2 YES YES YES YES
2-1/2 YES YES YES YES
3 YES YES YES YES
110
2 YES YES YES YES
2-1/2 YES YES YES YES
3 YES YES YES YES
135 3 YES YES YES
* Requires eld-provided and installed 1-1/2” exhaust accelerator.
** Kit 51W11 is provided with a 1-1/2” accelerator which must be for all 2 and 2-1/2” PVC installations.
+ Termination kits 44W92 and 44W93 are approved for use in Canadian installations to meet CSAB149.
++ The 44W92 Concentric kit is provided with a 1-1/2” accelerator, which must be installed on the exhaust outlet when this kit is used
with this furnace.

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Lennox Allied Air A95UH1D and is the answer not in the manual?

Lennox Allied Air A95UH1D Specifications

General IconGeneral
BrandLennox
ModelAllied Air A95UH1D
CategoryFurnace
LanguageEnglish

Related product manuals