507270-03Page 58 of 60 Issue 1917
19.  Remove the primary limit from the vestibule panel.
20.  Remove  top  cap  screws  to  allow  top  cap  to  be 
tilted  upward  to  allow  clearance  for  removing  heat 
exchanger.
21.  Remove  two  screws  from  the  front  cabinet  ange  at 
the blower deck. Spread cabinet sides slightly to allow 
clearance for removal of heat exchanger.
22.  Remove  screws  along  vestibule  sides  and  bottom 
which  secure  vestibule  panel  and  heat  exchanger 
assembly to cabinet. Remove two screws from blower 
rails  which  secure  bottom  heat  exchanger  ange. 
Remove heat exchanger from furnace cabinet.
23.  Back wash heat exchanger with soapy water solution 
or  steam.  If  steam  is  used  it  must  be  below  275°F 
(135°C).
24.  Thoroughly rinse and drain the heat exchanger. Soap 
solutions  can  be  corrosive. Take  care  to  rinse  entire 
assembly.
25.  Reinstall  heat  exchanger  into  cabinet  making  sure 
that  the  rear  bafe  of  the  heat  exchanger  assembly 
is nested under the support located at the rear of the 
cabinet. Remove the  indoor  blower to view this area 
through the blower opening.
26.  Re–secure the supporting screws along the vestibule 
sides.
27.  Reinstall  blower  assembly  and  reinstall  two  screws 
through rails.
28.  Reinstall  cabinet  screws  on  front  ange  at  blower 
deck.
29.  Reinstall screws securing top cap.
30.  Reinstall the primary limit on the vestibule panel.
31.  Route  heating  component  wiring  through  hole  in 
blower deck and reinsert strain relief bushing.
32.  Reinstall  pressure  switch  and  reconnect  pressure 
switch wiring.
33.  Carefully  connect  combustion  air  pressure  switch 
hosing from pressure switch to  proper  stubs  on  cold 
end header collector box.
34.  Reinstall 1/2” NPT (if removed) in the cold end header 
box. Reconnect drain tubing to collector box.
35.  Reinstall condensate trap pipe. Reconnect condensate 
drain line to the condensate trap.
36.  Reinstall electrical junction box.
37.  Reinstall  the  combustion  air  inducer  and  exible  no 
hub connector. Reconnect  the 2 pin plug to the  wire 
harness. 
38.  Reconnect  drain  tubes  between  ue  collar  and  cold 
end header box.
39.  Secure burner assembly to vestibule panel using four 
existing screws. Burners are self aligning to center of 
clam shells.
40.  Reconnect gas supply line to gas valve.
41.  Reconnect ame rollout switch wires.
42.  Reconnect sensor wire and reconnect 2 pin plug from 
ignitor.
43.  Reconnect wires to gas valve.
44.  Replace the blower compartment access panel.
45.  Refer  to  instruction  on  verifying  gas  and  electrical 
connections when reestablishing supplies.
46.  Follow lighting instructions to light and operate furnace 
for 5 minutes to ensure that heat exchanger is clean 
and dry and that furnace is operating properly.
47.  Replace heating compartment access panel.
Cleaning the Burner Assembly
1.  Turn  off  gas  and  electrical  power  to  the  furnace. 
Remove heating compartment access panel.
2.  Disconnect the gas supply line from the gas valve.
3.  Disconnect and label wires from gas valve.
4.  Disconnect ignitor wiring at 2 circuit plug.
5.  Disconnect and label wires from rollout switch.
6.  Disconnect and label ame sensor wire.
7.  Disconnect and label ground wire from burner/manifold 
assembly.
8.  Remove  four  screws  that  secures  burner/manifold 
assembly  to  vestibule.  Remove  the  assembly  and 
make note not to  allow  ignitor  plate to dislodge from 
the assembly.
9.  Gently  clean  the  face  of  the  burners  using  the  soft 
brush  attachment  on  a  vacuum  cleaner.  Visually 
inspect  the  inside  of  the  burners  and  crossovers  for 
any blockage caused by foreign matter. Remove any 
blockage
10.  Reinstall  the  burner/manifold  assembly  using  the 
existing  four  screws.  Burners  are  self  aligning  to 
center of clam shells.
11.  Reconnect ground wire.
12.  Reconnect ame sensor wire.
13.  Reconnect rollout switch wires.
14.  Reconnect ignitor wires.
15.  Reconnect gas valve wires.
16.  Reconnect gas supply line to gas valve.
17.  Refer  to  instructions  on  verifying  gas  and  electrical 
connections when re-establishing supplies.
18.  Follow instructions to place furnace in operation. Run 
furnace  5  minutes  to  ensure  burners  are  clean  and 
operating correctly.
19.  Replace heating compartment access panel.