Page 58
TABLE 20 
OUTDOOR TERMINATION USAGE*
Input Size
Vent Pipe Dia. 
in.
STANDARD CONCENTRIC
Flush Mount 
Kit
Wall Kit
Field 
Fabricated
1-1.2 inch 2 inch 3 inch
2 inch 3 inch
71M80 (US) 
444W92 (CA)
69M29 (US) 
444W92 (CA)
60L46 (US) 
444W93 (CA)
51W11 (US) 
51W12 
(CA)
22G44 (US) 
430G28 (CA)
44J40 (US) 
481J20 (CA)
045
6
1-1/2
3
YES
YES
1
YES
5
YES
2
YES
2
3
YES
YES
1
YES
5
YES
2
YES
2-1/2
3
YES
YES
1
YES
5
YES
2
YES
3
3
YES
YES
1
YES
5
YES
2
YES
070
6
1-1/2
3
YES
YES
1
YES
5
YES
2
YES
2
3
YES
YES
1
YES
5
YES
2
YES
2-1/2
3
YES
YES
1
YES
5
YES
2
YES
3
3
YES
YES
1
YES
5
YES
2
YES
090
2
3
YES
YES
5
YES
YES YES
2-1/2
3
YES
YES
5
YES
YES YES
3
3
YES
YES
5
YES
YES YES
110
2 YES YES
5
YES
YES YES
2-1/2 YES YES
5
YES
YES YES
3 YES YES
5
YES
YES YES
135 3 YES YES
5
YES
YES
NOTE - Standard Terminations do not include any vent pipe or elbows external to the structure. Any vent pipe or elbows external to the structure must be included in 
total vent length calculations. See vent length tables.
* Kits must be properly installed according to kit instructions.
1 Requires eld-provided outdoor 1-1/2” exhaust accelerator.
2 Concentric kits 71M80 and 44W92 include 1-1/2” outdoor accelerator, when used with 045 and 070 input models. 1-1/2 in. pipe must be transitioned to 2 in. when used 
with a concentric kit,
3 Flush mount kits 51W11 and 51W12 includes 1-1/2 in. outdoor exhaust accelerator, required when used with 045, 070 and 090 input models. 1-1/2 in. pipe must be 
transitioned to 2 in. pipe when used with the ushmount kit.
4 Termination kits 30G28, 44W92, 44W93 and 81J20 are certied to ULC S636 for use in Canada only.
5 See table 8 for vent accelerator requirements.
6 2 in. pipe to 1-1/2 in. reducer required and must be eld provided.
Joint Cementing Procedure
All  cementing  of  joints  should  be  done  according  to  the 
specications outlined in ASTM D 2855.
 DANGER
DANGER OF EXPLOSION!
Fumes from PVC glue may ignite during system check. 
Allow  fumes  to  dissipate  for  at  least  5  minutes  before 
placing unit into operation..
1 -  Measure and cut vent pipe to desired length.
2 -   Debur  and  chamfer  end  of  pipe,  removing  any 
ridges  or  rough  edges.  If  end  is  not  chamfered, 
edge  of  pipe  may  remove  cement  from  tting 
socket and result in a leaking joint.
NOTE - Check the inside of vent pipe thoroughly for 
any obstruction that may alter furnace operation.
3 -  Clean and dry surfaces to be joined.
4 -   Test t joint and mark depth of tting on outside of 
pipe.
5 -   Uniformly  apply  a  liberal  coat  of  PVC  primer  for 
PVC or use a clean dry cloth for ABS to clean inside 
socket  surface  of  tting  and  male  end  of  pipe  to 
depth of tting socket.
NOTE - Time is critical at this stage.  Do  not  allow 
primer to dry before applying cement.
6 -   Promptly apply solvent cement to end of pipe and 
inside socket  surface  of  tting.  Cement should  be 
applied lightly but uniformly to inside of socket. Take 
care  to  keep  excess  cement  out  of  socket. Apply 
second coat to end of pipe.
7 -   Immediately  after  applying  last  coat  of  cement  to 
pipe, and while both inside socket surface and end 
of pipe are wet with cement, forcefully insert end of 
pipe into socket until it bottoms out. Turn PVC pipe 
1/4 turn during assembly (but not after pipe is fully 
inserted) to distribute cement evenly. DO NOT turn 
ABS or cellular core pipe.
NOTE - Assembly  should  be  completed  within  20 
seconds  after  last  application  of  cement.  Hammer 
blows uld not be used when inserting pipe.