Page 1
INSTALLATION
INSTRUCTIONS
EL297UHV
508358-01
05/2023
© 2023 Lennox Industries Inc. 
Dallas, Texas  USA
ELITE
®
 SERIES GAS FURNACE
UP/FLOW HORIZONTAL AIR DISCHARGE
 CAUTION
As with any mechanical equipment, personal injury can 
result from contact with sharp sheet metal edges. Be 
careful when you handle this equipment.
AIR FLOW
UPFLOW
AIR FLOW
AIR FLOW
HORIZONTAL RIGHT
HORIZONTAL LEFT
THIS MANUAL MUST BE LEFT WITH THE 
HOMEOWNER FOR FUTURE REFERENCE
 This is a safety alert symbol and should never be 
ignored. When you see this symbol on labels or in man-
uals, be alert to the potential for personal injury or death.
 WARNING
Improper installation, adjustment, alteration, service 
or maintenance can cause property damage, personal 
injury or loss of life. Installation and service must  be 
performed by a licensed professional HVAC installer or 
equivalent, service agency, or the gas supplier.
 
   NOTICE
A thermostat is not included and must be ordered 
separately.
A  communicating  thermostat  must  be  used  in            
communicating applications.
In non-communicating applications, the Lennox 
ComfortSense® 7500 thermostat may be used, as well 
as other non-communicating thermostats.
In all cases, setup is critical to ensure proper system 
operation.
Field wiring for both communicating and non-
communicating applications is illustrated in diagrams,
which begin on Page 41.
Table of Contents
Unit Dimensions - inches (mm)  .....................................2
Shipping and Packing List ..............................................3
Safety Information ..........................................................3
Use of Furnace as Construction Heater .........................4
General ...........................................................................5
Shipping Bolt Removal ...................................................8
Installation - Setting Equipment ......................................8
Filters ............................................................................13
Duct System .................................................................13
 .......................................14
Joint Cementing Procedure .......................................... 15
Venting Practices ..........................................................16
Gas Piping ....................................................................36
Electrical .......................................................................39
Integrated Control .........................................................51
Conventional Thermostat (non-communicating) ...........52
Blower Data ..................................................................54
On-Board Links.............................................................58
Unit Start Up .................................................................60
Gas Pressure Adjustment .............................................61
Proper Combustion.......................................................62
High Altitude .................................................................62
Combustion Air for Non-Direct Vent Applications .........62
Repair Parts..................................................................63
Other Unit Adjustments.................................................64
Heating Sequence of Operation ...................................63
Service..........................................................................66
Program Unit Capacity/Size Mode ...............................68
Requirements for Commonwealth of Massachusetts ... 69