LOW MASS - PIPING DIAGRAM
Buffer Tank Piping
When installing low mass systems, additional water mass
may be required to avoid short cycling by the boiler. In
these applications it is recommended that a buffer tank be
installed.
Note:
DHW piping not shown for clarity. Reference applicable sections of this
manual for DHW piping details.
Internal Boiler circulator used on Primary circuit.
Reference Buffer Tank Installation Manual for proper sizing and installation.
Buffer Tank on Central Heat Circuit
H2O Stainless
Steel Buffer
Tank
MAGNETIC DIRT
SEPARATOR
PURGE VALVE
PN 240012998 REV A [04/15/2020]